Test bench
The percentages are on the cost of ramp, crosscuts, contingency and haulage over the life of the mine, undiscounted.
Eight deposits
Drag to turn, wheel or pinch to zoom, double tap to reframe. With the keyboard, arrows and the plus and minus keys.