Drag to rotate, scroll or pinch to zoom, tap a decline to pick it, double tap for the overview.
Before you go on
This demo uses a sample orebody, made up. It assumes homogeneous rock and doesn't model ventilation or geotechnics. The six options are calculated ahead of time with constrained optimization on grade and turning radius. It compares options; it doesn't claim any of them is the best possible. Costs are illustrative and several values are provisional.
Go to the test bench Four ways to trace the ramp on eight deposits, this one included, measured with the same yardstick and the same prices.
Sources
The sourced values come from these public documents. They are cited only to back those values.
- i-80 Gold, Archimedes Underground Project, Preliminary Economic Assessment, press release, exhibit 99.2, 2025. Backs decline development and development contingency.
- i-80 Gold, Granite Creek Underground Project, Preliminary Economic Assessment, press release, exhibit 99.2, 2025. Backs decline development and development contingency.
- i-80 Gold, Granite Creek Underground Feasibility Study, press release, 2026. Backs section width and section height.
- Published decline design case with grade and turning radius constraints, Mining Technology journal, 2008. It is the source of the maximum grade, the minimum radius and the straight between opposite curves. The test bench rebuilds that case in «The yardstick».
This is what OreTally does with the real plan
Quantity times consumption times price, line by line, and a waterfall that explains every difference in the language of whoever answers for the budget.
Go to app.oretally.com